Technical Data.

 

Number of Coats: 2

Spreading Rate Per Coat: 1.5m2/ L

Wet Film Per Coat: 667 microns

Recoat(@25oC): 2 hours

Curing time: 7 days

Colour: Light Grey

Thinner: Water

Shelf Life: 12 months

Volatile Organic Compound (VOC) Content 26 g/L
Properties Test method Test Results

Adhesion:

Concrete

Fibre Board

Plywood

Light weight block

Brick

Steel

ASTM D4541

 

1.0-1.5 N/mm2

2.0 N/mm2

1.8 N/mm2

0.5 N/mm2(block failure)

2.5 N/mm2

1.6 - 3.0 N/mm2

Elongation AS 4858:2004 317%
Water Vapour Transmission ASTM E96 1g/ m2/ 24hr
Water Absorption AS 3558.1 2.73%
Chemical Resistance Test strips immersed for 7days before visual examination:

Dilute Acids

Dilute Alkali

Salt Solutions

Good

Good

Good

Volatile Organic Compound (VOC) Content SCAQMD 304 - 91 28g / L

Application Guide.

 

Surface Preparation

  1. Surface must be clean and dry, sound and free from dust and loose material. The surface should have a light even texture. Masonry should be flush pointed and ensure all high points and protrusions are ground off.
  2. Blow - holes, areas of honey combing, etc., to be filled and the surface brought back to an even profile with a suitable repair render modifier with Acrylic Modifier. Trowel to an even finish and allow to cure.
  3. On damp surfaces, apply a priming treatment of 2 coats of WB2K.

Application Procedure and Equipment

  1. Typical application equipment includes brush, roller, squeegee or airless spray.
  2. Apply 2 nd coat at 90oC(right angles)to first coat.
  3. For trafficable and heavy duty areas, and where thicker films are required Elastoseal TR used in combination with Polyfab will result in dry film thicknesses of approximately 1.5mm(1.500 microns). This is achieved by applying Elastoseal TRat 1m2/L and While still wet, embedding the Polyfab into the membrane. Ensure all overlaps are at least 100mm and that an expansion joint overlap the fabric by 200mm on either side on the joint. When the first coats has dried, aplly a second coat at 1m2/L and allow to dry.
  4. Elastoseal TR to cure for 7 days before performing a ponding test. Fill the areas with approximately 50mm of water and leave for 2 hours to ensure there are no leaks.

Precautions.

 

  • Do not applyif the temperature is below 10oC, if relative humidity is above 85% or if rain is imminent.
  • Do not apply to wet substrates - moisture content should be less than 15%. Check with a moisture meter if nessesary.

Transport and Storage.

 

Sizes: 15L

Weights: 20.5 kg

Dangerous Goods Class: N/A

Flash Point: N/A

UN Number: N/A

Thống kê

Các thành viên : 181
Content : 276
Liên kết web : 7
Số lần xem bài viết : 1256490
mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday187
mod_vvisit_counterYesterday236
mod_vvisit_counterThis week1417
mod_vvisit_counterThis month1692
mod_vvisit_counterAll852508

Khách Online

Hiện có 22 khách Trực tuyến